Concrete mix components are usually chosen by supplier stock and price. We built a material-selection process
through DMAIC that ranks components by how much they drive compressive strength, so the choice follows the data.
DMAIC
Define: project charter and a process flow diagram of the selection process.
Measure: descriptive statistics, histograms, box plots, and normality probability plots in
Minitab. Most components were roughly normal; age was exponential, so we ran the analysis with and without it.
Analyze: multiple regression with every component significant (p < 0.05) and R² of about 61%,
falling to 44% without age - so age stayed in. Interaction terms added about 10% R² but were left out as
unneeded complexity. Residual plots confirmed the normality assumption.
Improve: rank components by the size of their t-value - cement (24.82), age (20.99), blast
furnace slag (17.39), then water and fly ash. Age can't be chosen, so the selection focuses on cement and slag:
separate regressions for each, then an Excel comparison of the maximum and average predicted strength put
cement first.
Control: we argued a selection procedure needs no ongoing control, but still built an I-MR
(individuals and moving range) chart of compressive strength. Its out-of-control points stayed in, because no assignable cause could
be found for them. Done again, I'd chart the strength of the batches the new process actually produces.
Residual plots - the normality check behind the regression.I-MR chart of compressive strength, out-of-control points flagged.
process control
The course also built the statistical process control toolkit: X-bar and R charts for variables, NP charts for
defectives, moving range charts, and CUSUM charts to catch small sustained shifts faster than Shewhart limits do.
what it shows
DMAIC structure from charter to recommendation
Regression judgment - keeping the variable that matters, dropping complexity that doesn't