← All engineering work
Quality

Six Sigma: DMAIC & Process Control

A repeatable way to pick concrete mix components by what actually drives strength - plus the control charts behind statistical process improvement.

course
IMSE 4675 Six Sigma & Statistical Process Improvement
team
3-person team
timeline
Winter 2022
data
UCI Concrete Compressive Strength dataset (public)
DMAICMinitabRegressionControl chartsSPC

the idea

Concrete mix components are usually chosen by supplier stock and price. We built a material-selection process through DMAIC that ranks components by how much they drive compressive strength, so the choice follows the data.

DMAIC

  • Define: project charter and a process flow diagram of the selection process.
  • Measure: descriptive statistics, histograms, box plots, and normality probability plots in Minitab. Most components were roughly normal; age was exponential, so we ran the analysis with and without it.
  • Analyze: multiple regression with every component significant (p < 0.05) and R² of about 61%, falling to 44% without age - so age stayed in. Interaction terms added about 10% R² but were left out as unneeded complexity. Residual plots confirmed the normality assumption.
  • Improve: rank components by the size of their t-value - cement (24.82), age (20.99), blast furnace slag (17.39), then water and fly ash. Age can't be chosen, so the selection focuses on cement and slag: separate regressions for each, then an Excel comparison of the maximum and average predicted strength put cement first.
  • Control: we argued a selection procedure needs no ongoing control, but still built an I-MR (individuals and moving range) chart of compressive strength. Its out-of-control points stayed in, because no assignable cause could be found for them. Done again, I'd chart the strength of the batches the new process actually produces.
Minitab four-in-one residual plots for the compressive strength regression
Residual plots - the normality check behind the regression.
I-MR control chart of concrete compressive strength with out-of-control points flagged in red
I-MR chart of compressive strength, out-of-control points flagged.

process control

The course also built the statistical process control toolkit: X-bar and R charts for variables, NP charts for defectives, moving range charts, and CUSUM charts to catch small sustained shifts faster than Shewhart limits do.

what it shows

  • DMAIC structure from charter to recommendation
  • Regression judgment - keeping the variable that matters, dropping complexity that doesn't
  • Honesty about what a phase can and can't do